Interconnect structure for an integrated circuit and method of fabricating an interconnect structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9466563
APP PUB NO 20160155701A1
SERIAL NO

14557111

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit includes first and second metallization levels. The first metallization level includes a first metal routing path. The second metallization level includes a dielectric layer having a via opening formed therein extending vertically through the dielectric layer to reach a top surface of the first metal routing path. A metal plug is deposited at a bottom of the via opening in direct contact with the first metal routing path. A remaining open area of the via opening is filled with a metal material to define a second metal routing path. The metal plug is formed of cobalt or an alloy including cobalt, and has an aspect ratio of greater than 0.3.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION;STMICROELECTRONICS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kelly, James John Schenectady, US 6 149
Mignot, Yann Slingerlands, US 119 279
Spooner, Terry Clifton Park, US 5 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00