Thermal post-combustion unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10047955
APP PUB NO 20160161116A1
SERIAL NO

14963367

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thermal post-combustion unit with a combustion chamber having a combustion space to which exhaust air can be supplied, having a burner for heating the combustion space, whereby clean air is produced, having an inlet for exhaust air and having an outlet for clean air. A flow path connects the inlet to the combustion space. Exhaust air can be heated by a heat-exchanger system. The flow path comprises a first, second and third flow section, wherein the first flow section is connected to the inlet and the exhaust air flows from the third flow section to the combustion space, wherein the flow sections connect to one another at diversion ends so that the exhaust air flows through two successive flow sections with different flow directions. Heat-exchanger pipes extend at least inside the first and the second flow section or at least the first and the second flow section extend inside heat-exchanger pipes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EISENMANN SE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Strobel, Volker Steinenbronn, DE 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00