Voltage supply for supplying in zones voltages proportional to a master supply votlage using voltage mirroring

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9459646
APP PUB NO 20160161972A1
SERIAL NO

14601062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A scaled voltage supply to supply voltage biases to circuits in voltage zones. The scaled voltage supply includes a master voltage corresponding to a voltage drop across a master-upper rail having a voltage Vdd and a master-lower rail having a voltage Vss=0. Further, the supply includes a voltage-divider network dividing the master voltage Vdd into intermediate voltages αVdd, βVdd, etc., wherein α and β are predetermined constants. These intermediate voltages scale with the master voltage and are supplied to the voltage zones using non-invasive soft rails. In one implementation the soft rails use voltage mirrors to supply the intermediate voltages to the circuits within voltage zones.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pan, Hui Coto De Caza, US 40 504
Tan, Junhua Irvine, US 41 174
Wang, Jing Riverside, US 1507 11315
Yao, Yuan Irvine, US 173 986

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00