Interposer with lattice construction and embedded conductive metal structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9443799
APP PUB NO 20160172288A1
SERIAL NO

14571352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lattice structure is formed in a non-silicon interposer substrate to create large cells that are multiples of through hole pitches to act as islands for dielectric fields. Each unit cell is then filled with a dielectric material. Thereafter, holes (i.e., through holes or blind holes) are created within the dielectric material in the cells. After hole formation, a conductive metal is formed into each of the holes providing an interposer. This method can enable fine pitch processing in organic-based materials, isolates the thermal coefficient of expansion (TCE) stress from metal vias to low TCE carriers and creates a path to high volume, low costs components in panel form.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Audet, Jean Granby, CA 37 133
Fasano, Benjamin V New Windsor, US 71 1146
Li, Shidong Poughkeepsie, US 65 158

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00