Process for additive manufacturing of parts by melting or sintering particles of powder(s) using a high-energy beam with powders adapted to the targeted process/material pair

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10710156
APP PUB NO 20160175929A1
SERIAL NO

14902699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of fabricating parts out of metallic, intermetallic, ceramic, ceramic matrix composite, or metal matrix composite material with discontinuous reinforcement, includes melting or sintering powder particles by means of a high-energy beam. The powder used is a single powder of particles that present sphericity lying in the range 0.8 to 1.0 and of form factor lying in the range 1 to √2, each powder particle presenting substantially identical mean composition, and the grain size distribution of the particles of the powder is narrowed around the mean diameter value d50% in such a manner that: (d90%−d50%)/d50%≤0.66; and (d50%−d10%)/d50%≤0.33; with a “span”: (d90%−d10%)/d50%≤1.00.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN AIRCRAFT ENGINESPARIS FRANCE PARIS PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colin, Christophe Evry, FR 18 271
Kirschner, Laetitia Paris, FR 1 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00