Modeling workload information for a primary storage and a secondary storage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9524101
APP PUB NO 20160179390A1
SERIAL NO

15055473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a computer program product, system, and method for modeling workload information for a primary storage and a secondary storage. A determination is made of: a first type and second type of Input/Output (I/O) operations with respect to extents configured in the primary storage; a cumulative I/O workload for the primary storage based on a first type and a second type of I/O operations at different cumulative storage amounts of the primary storage indicating a concentration of the I/O workload on the primary storage; and cumulative I/O workload for the secondary storage based on the first type and the second type of I/O operations at different storage amounts indicating a concentration of the I/O workload of the first type of I/O operations on the secondary storage. A performance gap is determined based on the cumulative I/O workloads for the primary and secondary storages at one of the storage amounts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Yong Shanghai, CN 82 792
Li, Jun Tao Shanghai, CN 4 35
Xu, Yan Tucson, US 309 2326

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00