Systems and methods for generating injection-locked, frequency-multiplied output signals

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9564880
APP PUB NO 20160181980A1
SERIAL NO

14581337

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are systems and methods for generating injection-locked, frequency-multiplied output signals. In an embodiment, a circuit includes a ring of a number (N) serially connected delay-buffer elements and an injection-pulse-generation circuit. Each delay-buffer element provides a time delay (D), and at least some of them have at least one pulse-locking injection port. The injection-pulse-generation circuit is configured to transmit balanced-delay injection-pulse signals—that are generated by applying balanced-delay selection logic to a clock signal according to pulse-selection control signals—to the pulse-locking injection ports to provide, at the ring output port, an injection-locked, frequency-multiplied output signal having a frequency that equals the reciprocal of (N*D) and that bears the same proportional relationship to the frequency of the clock signal that the period of the clock signal bears to (N*D).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MOTOROLA SOLUTIONS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cafaro, Nicholas G Parkland, US 12 108
Stengel, Robert E Pompano Beach, US 88 2611

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00