Method for preparing synthetic fuel from natural gas of stranded gas field and associated gas from oil and gas fields by GTL-FPSO process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822311
SERIAL NO

14951857

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for preparing a synthetic fuel on a vessel above a stranded gas field or an oil & gas field by a GTL-FPSO process, more particularly to a method for preparing a synthetic fuel with superior economic feasibility, productivity and efficiency using a compact GTL (gas to liquid) apparatus that can be used for a stranded gas field or an oil & gas field and an FPSO (floating production, storage and offloading) process under a condition optimized for the ratio of carbon dioxide in the stranded gas field or the oil & gas field and an apparatus for the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOREA INSTITUTE OF SCIENCE AND TECHNOLOGY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Gi Hoon Seoul, KR 6 4
Jung, Jae Sun Seoul, KR 19 29
Kim, Na Young Seoul, KR 102 516
Lee, Jae Suk Seoul, KR 69 333
Lee, Sang Yong Seoul, KR 112 984
Lim, Sung Soo Seoul, KR 6 4
Moon, Dong Ju Seoul, KR 40 185
Noh, Young Su Seoul, KR 6 4
Yang, Eun Hyeok Seoul, KR 10 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00