Self-propelled road milling machine for working road surfaces, as well as method for working road surfaces with a road milling machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10024005
APP PUB NO 20160186392A1
SERIAL NO

14974530

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a self-propelled road milling machine for working road surfaces, comprising a machine frame, comprising a milling drum mounted to rotate and extending in axial direction transverse to the direction of travel, and a milling drum housing enclosing the milling drum, where the milling drum comprises multiple tools circumferentially preferably arranged in the shape of a helix, where the tools, except for the axial peripheral area, feature a specified mutual line spacing, it is provided for the following features to be achieved: an oscillation drive exercises an oscillation stroke on the axis of the milling drum moving to and fro in axial direction relative to the machine frame, where the rotating movement of the tools is superimposable with an axial movement parallel to the axis of the milling drum, the stroke of which is adjustable to the line spacing between two axially neighboring tools.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WIRTGEN GMBH53578 WINDHAGEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barimani, Cyrus Konigswinter, DE 287 2592
Boetzius, Sebastian Siegburg, DE 1 5
Mahlberg, Axel Hennef, DE 15 281

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00