Cooling structure of internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10107171
APP PUB NO 20160186641A1
SERIAL NO

14977638

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling structure of an internal combustion engine includes a cylinder block, an inner-block coolant passage, a cylinder head, and an inner-head coolant passage. In the cylinder block, cylinders are provided in a row in a cylinder row direction. The inner-head coolant passage is provided in the cylinder head and includes a main coolant passage, an upper exhaust side coolant passage, and a lower exhaust side coolant passage. The main coolant passage is provided above combustion chambers and extends in the cylinder row direction so that a coolant flows into the main coolant passage from the inner-block coolant passage at a first end side of the cylinder head in the cylinder row direction and so that the coolant flows out from the main coolant passage at a second end side of the cylinder head opposite to the first end side in the cylinder row direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Konishi, Yukio Wako, JP 16 70
Ogino, Hirotaka Wako, JP 24 26
Takatoku, Takayuki Wako, JP 3 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00