Method of producing film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10338467
APP PUB NO 20160187774A1
SERIAL NO

14909857

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a film includes: a disposing step of disposing a photocurable composition on a substrate; a mold contact step of bringing the photocurable composition and a mold into contact with each other; a photoirradiation step of irradiating the photocurable composition with light to form a cured product; and a mold release step of releasing the cured product and the mold from each other, in which the method further includes an alignment step of aligning the mold and the substrate with each other before the photoirradiation step, in which the photocurable composition contains at least a polymerizable compound serving as a component (A) and a photopolymerization initiator serving as a component (B), and in which the polymerizable compound has a polymerization conversion ratio of 50% or more when exposed to light under conditions of an illuminance of 0.12 mW/cm2 and an exposure time of 11.0 seconds.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CANON KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honma, Takeshi Tokyo, JP 24 98
Ito, Toshiki Kawasaki, JP 120 660
Kawasaki, Youji Utsunomiya, JP 24 157
Yonezawa, Shiori Tokyo, JP 19 73

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00