Method for condition monitoring of a distributed drive-train

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10621501
APP PUB NO 20160189050A1
SERIAL NO

14909788

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for condition monitoring of distributed drive-trains using Bayesian data fusion approach for measured data includes measurement of physical signals obtained from sensors attached to the components being chosen from the drive-train which are delivered to the computer means for processing the measured data and performing data fusion processes, using a data from information database containing at least one information system. The method is characterized by comprising two stages for data fusion processes performed by using Bayesian Inference, the first one for local data fusion process and the second one for global data fusion process, and on the basis of the second stage the assessment process of the condition of the drive-train is performed by choosing the maximum value of the received data, which maximum value serves as an indicator for the most likely fault present in the drive-train.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ABB TECHNOLOGY AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jaramillo-Velasquez, Victor-Hugo Medellin, CO 1 4
Orkisz, Michal Cracow, PL 15 77
Ottewill, James Middlesex, GB 14 46
Rzeszucinski, Pawel Kedzierzyn-Kozle, PL 6 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00