Fuel cell system as well as vehicle having such a fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10207597
APP PUB NO 20160190611A1
SERIAL NO

14977959

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell system including: a fuel cell stack; a cathode gas supply system including a cathode supply path for feeding cathode operating gas into the fuel cell stack and a cathode exhaust gas path for discharging cathode exhaust gas out of the fuel cell stack, and a fuel cell cooling system for cooling the fuel cell stack including a coolant path into which the fuel cell stack is integrated so as to transfer heat is provided. It is provided that the cathode gas supply system also includes a turbine arranged in the cathode exhaust gas path, and the coolant path of the fuel cell cooling system in the flow path of the cathode exhaust gas downstream from the turbine is in heat-transferring contact with the cathode exhaust gas path. This achieves a cooling of the coolant by the cathode exhaust gas and a heating of the cathode exhaust gas by the coolant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AUDI AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berger, Oliver Braunschweig, DE 28 159
Grundei, Daniel Braunschweig, DE 8 11
Kleppa, Oliver Hannover, DE 2 2
Lucas, Christian Braunschweig, DE 38 235

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00