Graphene fiber for aerospace composites

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10875986
APP PUB NO 20160194482A1
SERIAL NO

14589036

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Graphene fibers made from a graphene film formed into an elongated fiber-like shape and composite materials made from the graphene fibers. The graphene film has amine groups formed on at least an outer surface of the graphene film and epoxide groups formed on at least one edge of the graphene film. The amine groups are formed in a functionalized area on the outer surface of the graphene film that is within about 10 microns from the at least one edge of the graphene film, or the functionalized area may extend the entire width of the graphene film. The graphene film may also have holes formed through the graphene film. The elongated fiber-like shapes may be the graphene film in a rolled spiral orientation or the graphene film in a twisted formation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE BOEING COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Griess, Kenneth H Kent, US 40 416
Humfeld, Keith Daniel Federal Way, US 78 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 29, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00