Reactor internal structure and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850581
APP PUB NO 20160194763A1
SERIAL NO

15048227

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coating of niobium oxide, zirconium titanate, or nickel titanate is formed on at least a part of a surface of a jet pump member constituting a jet pump serving as a reactor internal structure of a boiling water reactor. Further, a solution containing, e.g., a niobium compound is applied to at least a part of the surface of the jet pump member constituting the jet pump, and the jet pump member coated with the solution is heat-treated to form a coating of, e.g., niobium oxide. With this configuration, the jet pump member constituting the jet pump of the boiling water reactor is provided such that deposition of crud can be sufficiently suppressed on the jet pump member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaneko, Tetsuji Yokohama, JP 6 3
Kinugasa, Kunihiko Yokohama, JP 25 39
Morishima, Yasuo Yokohama, JP 22 143
Okamura, Masato Yokohama, JP 21 32
Saito, Norihisa Yokohama, JP 16 165
Sayano, Akio Yokohama, JP 19 146
Yamazaki, Kenji Yokohama, JP 123 2527

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00