Cooling fan control device for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10132058
APP PUB NO 20160201545A1
SERIAL NO

14917101

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The purpose of the present invention is to provide a cooling fan control device for a construction machine, whereby the effects of heat caused by warm-up operation can be suppressed. This cooling fan control device is equipped with a control unit (10a) that controls the rotational speed of a cooling fan (21) in accordance with a main pump discharge pressure (P) detected by a main pump discharge pressure sensor (25), an engine cooling water temperature (Tw) detected by an engine cooling water temperature sensor (26), a hydraulic oil temperature (To) detected by a hydraulic oil temperature sensor (27), and an engine rotational speed (E) detected by an engine rotational speed sensor (28). The cooling fan (21) is rotated at the rotational speed controlled by the control unit (10a), thereby sending the generated cooling air to an oil cooler (19) and a control valve (13).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI CONSTRUCTION MACHINERY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanehama, Mitsuhiko Tsuchiura, JP 8 35
Nakamura, Tsuyoshi Tsuchiura, JP 252 1900
Sato, Kensuke Tsuchiura, JP 37 329

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 20, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 20, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00