Power management for sugarcane harvesters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9402344
APP PUB NO 20160205869A1
SERIAL NO

14600930

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sugarcane harvester and related method are disclosed for powering various sugarcane harvester operations. An energy storage device may be configured to receive electrical power from one or more electric machines for storage. The energy storage device may be configured to provide electrical power to the one or more electric machines to power operation of the one or more electric machines. An operating state of the sugarcane harvester may be identified, wherein the operating state is associated with one or more of a power requirement, a torque requirement, and an engine speed requirement for the sugarcane harvester. Based upon identifying the operating state, the one or more electric machines may be caused to receive electrical power from the energy storage device for conversion by the one or more electric machines to mechanical power, in order to power an operation of the sugarcane harvester.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Almeida, Kent M Napoleonville, US 7 16
Sheidler, Alan D Moline, US 45 567
Wenzel, Craig E Chicago, US 9 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00