Image processing apparatus, method, and storage medium for maintaining linearity between an exposure intensity and density of an output image

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9690228
APP PUB NO 20160209773A1
SERIAL NO

14992276

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An image processing apparatus that generates a halftone image to be used in a case where an image is formed on a printing medium by exposing a photoreceptor by intensity modulation of a light beam, having a multivalued dither processing unit configured to generate N-nary (N≧3) image from an input image by a dither method, a determination unit configured to determine whether a difference in pixel value between pixels adjacent to each other in an exposure scanning direction exceeds a predetermined limit value for each pixel of the N-nary image generated by the multivalued dither processing unit, and a correction unit configured to correct the pixel values of the adjacent pixels whose difference in pixel value has been determined to exceed the predetermined limit value so that the difference does not exceed the limit value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CANON KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Otani, Ryosuke Tokyo, JP 40 155

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00