Storage battery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10044200
APP PUB NO 20160211681A1
SERIAL NO

14914195

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A storage battery system connected to a power system includes: a storage battery; a BMU which monitors a state of the storage battery; a PCS which converts AC power of the power system into DC power to charge the storage battery with the DC power and converts DC power of the storage battery into AC power to discharge the AC power to the power system; and a control device. The control device receives a charge/discharge request from an EMS and storage battery information supplied from the BMU and controls the PCS based on the charge/discharge request and the storage battery information. The control device includes a charge/discharge command unit which calculates chargeable/dischargeable electric power based on the storage battery information and determines a charge/discharge command to the PCS based on the charge/discharge request by using the chargeable/dischargeable electric power as a constraint condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hanada, Masato Tokyo, JP 15 57
Tsurumaru, Daisuke Tokyo, JP 11 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00