Continuous casting method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9682422
APP PUB NO 20160214166A1
SERIAL NO

15025184

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a continuous casting method for casting an aluminum-deoxidized molten stainless steel 1 by using a continuous casting apparatus 100 in which a long nozzle 3 extending into a tundish 101 is provided at a ladle 2, the molten stainless steel 1 is poured through the long nozzle 3 into the tundish 101, while immersing a spout 3a into the poured molten stainless steel 1, and the molten stainless steel 1 in the tundish 101 is poured into a casting mold 105. A TD powder 5 is sprayed so that the powder covers the surface of the molten stainless steel 1 in the tundish 101, a nitrogen gas is supplied around the molten stainless steel 1, and a calcium-containing material is added to the molten stainless steel 1 in the tundish 101. The surface of the molten stainless steel 1 after casting is ground.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL STAINLESS STEEL CORPORATIONTOKYO 100-0005

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Hiroaki Yamaguchi, JP 5 21
Honda, Yuuki Yamaguchi, JP 6 8
Morikawa, Hiroshi Yamaguchi, JP 92 821
Nukushina, Noriaki Yamaguchi, JP 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00