In-situ power charging

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9845153
SERIAL NO

15003088

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device includes a propulsion unit configured to move the device and a steering unit configured to control the direction of the device. The device also includes a power unit configured to provide power to the propulsion unit and a charging unit configured to use an electric field to provide electrical power to the power unit. The device further includes a first magnetic sensor configured to determine a vector of one or more magnetic fields and a processor communicatively coupled to the propulsion unit, the steering unit, the power unit, and the magnetic sensor. The processor is configured to receive, from the magnetic sensor, a time-varying signal indicative of a magnetic field and determine, based on the time-varying signal, that the magnetic field is associated with an electrical power transmission line. The processor is further configured to cause the steering unit to direct the device toward the electrical power transmission line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LOCKHEED MARTIN CORPORATION6801 ROCKLEDGE DRIVE BETHESDA MD 20817

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sekelsky, Stephen M Princeton, US 3 183

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00