Liquid injected screw compressor, controller for the transition from an unloaded state to a loaded state of such a screw compressor and method applied therewith

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10704550
APP PUB NO 20160215777A1
SERIAL NO

14917190

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Liquid injected screw compressor with an inlet valve and blow-off valve; a liquid circuit with injector; a controller for the transition from unloaded to loaded, whereby when unloaded the inlet valve is closed and the blow-off valve is open, and when loaded the inlet valve is open and the blow-off valve is closed, and whereby during an aforementioned transition, when the injection pressure is below a minimum threshold, the inlet valve remains closed and is opened with a certain delay and that there are means to gradually increase the injection during this delay and to open the inlet valve when the injection pressure has reached the minimum threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ATLAS COPCO AIRPOWER NAAMLOZE VENNOOTSCHAP2610 WILRIJK

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Schamphelaere Pieter Wilrijk, BE 7 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 7, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 7, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00