Sheet manufacturing apparatus and sheet manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9840023
APP PUB NO 20160221213A1
SERIAL NO

14988951

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sheet manufacturing apparatus of the present invention includes a defibrating unit that defibrates a material containing fibers into a defibrated material, and a deposition unit that deposits a defibrated material defibrated by the defibrating unit. The deposition unit includes a material supply port through which the defibrated material from the defibrating unit is supplied, a plurality of opening ports through which the supplied defibrated material passes, and a dwell area disposed between the material supply port and the opening ports so that the defibrated material temporarily dwells in the dwell area. The dwell area allows the defibrated material to temporarily dwell in the dwell area so that a variation amount of the defibrated material that passes through the opening ports becomes smaller than a variation amount of the defibrated material supplied through the material supply port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakamura, Masahide Nagano, JP 94 899

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00