Hydraulic engagement device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10151356
APP PUB NO 20160223032A1
SERIAL NO

15014010

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic engagement device includes a first friction engagement element, a second friction engagement element, a cylinder, a piston, an oil chamber, hydraulic oil, and a release groove. The first friction engagement element and the second friction engagement element are to rotate around a third rotational axis. The piston is slidably provided in the cylinder. The oil chamber is defined between the piston and the cylinder. The hydraulic oil is supplied to the oil chamber to move the piston to push the first friction engagement element or the second friction engagement element so that the first friction engagement element engages the second friction engagement element. The release groove is provided on the cylinder or the piston. The hydraulic oil in the oil chamber is released through the release groove when a stroke of the piston exceeds a predetermined level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujinuma, Sachi Wako, JP 7 11
Hosoda, Eisuke Wako, JP 4 6
Tanaka, Sota Wako, JP 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00