Control system for hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920502
SERIAL NO

14915654

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system for hybrid construction machine includes a regeneration motor configured to be rotated by working fluid introduced from a turning circuit, a pressure detector configured to detect a turning pressure during a turning operation of the turning motor or a braking pressure during a braking operation of the turning motor, a switching valve for turning regeneration configured to perform turning regeneration by introducing the working fluid from the turning circuit to the regeneration motor when being switched to an open position by a pressure of pilot fluid, an electromagnetic proportional pressure reducing valve configured to be switched to an open position and generate a pilot secondary pressure for switching the switching valve for turning regeneration to the open position when a pressure detected by the pressure detector reaches a first set pressure, and a pilot switching valve configured to allow the passage of the pilot fluid for switching the switching valve for turning regeneration to the open position by being switched to an open position when the pressure of the turning circuit reaches a second set pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KYB CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Egawa, Masahiro Saitama, JP 37 168
Kawasaki, Haruhiko Kanagawa, JP 40 229

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00