Flow meter and flow control device provided therewith

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10073469
APP PUB NO 20160239026A1
SERIAL NO

15028127

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow meter includes an inlet side switching valve, an outlet side switching valve on a downstream of the inlet side valve, and a control valve on a downstream of the outlet side valve that are connected with each other by flow passages having internal volumes, a pressure sensor on an upstream side of the control valve, and a larger flow rate measuring section for calculating a flow rate based on a build-down volume of an internal volume of the passage between an outlet of the inlet side valve and an inlet of the control valve, and a smaller flow rate measuring section for calculating a flow rate based on a build-down volume of an inner capacity of the passage between an outlet of the outlet side valve and the inlet of the control valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJIKIN INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dohi, Ryousuke Osaka, JP 103 1938
Hidaka, Atsushi Osaka, JP 31 330
Ikeda, Nobukazu Osaka, JP 232 4012
Nagase, Masaaki Osaka, JP 84 982
Nishino, Kouji Osaka, JP 165 2271
Sugita, Katsuyuki Osaka, JP 54 342

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00