Semiconductor memory device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9570180
SERIAL NO

15051546

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor memory device includes a first memory block having a first memory cell transistor and a first select transistor, a second memory block having a second memory cell transistor and a second select transistor, a first select gate line that is electrically connected to a gate of the first select transistor, and a second select gate line that is electrically connected to a gate of the second select transistor. During writing of data to a memory cell transistor in the first block, a first voltage is applied to the first select gate line during a first time period, a second voltage is applied to the second select gate line during a second time period after the first time period, and a third voltage lower than the first voltage is applied to the first select gate line during a third time period after the second time period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maejima, Hiroshi Setagaya Tokyo, JP 234 4162

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00