Pressing load setting method of tire testing machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9880074
SERIAL NO

14962675

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tire and a drum are relatively moved so that a pressing load is increased, and stopped when the pressing load becomes a predetermined value lower than a target value. A value of the pressing load and a relative distance between the tire and the drum are measured at timings when a circumferential position of the tire is the same. A dynamic longitudinal spring constant of the tire is calculated by using change amounts of the pressing load and the relative distance. An adjustment amount serving as a distance by which the tire and the drum are relatively moved so that a value of the pressing load when relative movement is stopped becomes the target value is calculated by using the dynamic longitudinal spring constant and a difference between the arrival value and the target value. The tire and the drum are relatively moved by the adjustment amount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Kohei Takasago, JP 40 337
Matsushita, Yasuhiro Takasago, JP 21 207

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00