Actuation assembly using pressure delay

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9732588
SERIAL NO

14391075

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A downhole assembly for tool actuation using pressure delay is provided. The downhole assembly can include a chamber, a pressure path, a pressure damper, a pressure source, and a member. The pressure path can be positioned between first and second ends of the chamber. The pressure damper can reduce a rate at which pressure is communicated in the pressure path. Pressure from the pressure source can be communicated to the first end of the chamber and the second end of the chamber at different rates. The member can be positioned in the chamber between the first end and the second end. The member can actuate a downhole tool in response to a pressure difference between the first end and the second end. The pressure difference can result from a difference in between the first rate and the second rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fripp, Michael Linley Carrollton, US 328 2424
Vick,, Jr James Dan Dallas, US 62 331

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00