Manufacturing method of head

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10011113
SERIAL NO

15009527

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method of a head which includes a channel formation substrate having two piezoelectric actuator rows formed thereon, a driving circuit, and a driving circuit board which is provided with a first bump and a second bump. In the method, a piezo element is formed and the first bump is formed on the outside of the piezoelectric actuator row, on the driving circuit board, an adhesive layer is provided on both sides of the first bump and the second bump, a first through hole and a second through hole are formed on the driving circuit board, a first connection wiring and a second connection wiring which are connected to the driving circuit are formed, and a first electrode of the piezoelectric actuator is electrically connected to the first connection wiring via the first bump and a second electrode is electrically connected to the second connection wiring via the second bump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamaguchi, Toshiaki Fujimi-machi, JP 21 66
Hirai, Eiju Minowa-machi, JP 141 574
Naganuma, Yoichi Matsumoto, JP 53 115
Takabe, Motoki Shiojiri, JP 148 334

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 3, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 3, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00