Process for making phenol and/or cyclohexanone

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9546121
APP PUB NO 20160264501A1
SERIAL NO

15031759

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for making phenol and/or cyclohexanone comprises: (A) oxidizing a cyclohexylbenzene feed to obtain an oxidation product comprising cyclohexylbenzene, cyclohexyl-1-phenyl-1-hydroperoxide and phenol; (B) separating at least a portion of the oxidation product to obtain a first fraction comprising cyclohexyl-1-phenyl-1-hydroperoxide and a second fraction comprising cyclohexylbenzene and phenol; (C) removing at least a portion of the phenol from at least a portion of the second fraction to obtain a third fraction; (D) recycling at least a portion of the cyclohexylbenzene in the third fraction to the oxidizing step (A); and (E) contacting at least a portion of the cyclohexyl-1-phenyl-1-hydroperoxide in the first fraction with an acid catalyst in a cleavage reactor under cleavage conditions to obtain a cleavage product comprising phenol and cyclohexanone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EXXONMOBIL CHEMICAL PATENTS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dakka, Jihad M Whitehouse Station, US 127 682
Patel, Bryan A Jersey City, US 28 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00