Nonvolatile semiconductor memory device and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10020364
SERIAL NO

14849748

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One embodiment includes: forming a laminated body by alternately laminating a conducting layer and an interlayer insulating layer on a substrate; forming a memory hole passing through the laminated body; forming a memory gate insulating layer including a charge storage layer on an inner wall of the memory hole; forming a first semiconductor layer on the memory gate insulating layer; forming a cover film on the first semiconductor layer; removing the memory gate insulating layer, the first semiconductor layer, and the cover film on a bottom surface of the memory hole, to expose the substrate; forming an epitaxial layer on the exposed substrate; removing the cover film; and forming the second semiconductor layer along the first semiconductor layer, to electrically couple: the substrate to the first semiconductor layer; and the substrate to the second semiconductor layer, via the epitaxial layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujiwara, Makoto Yokkaichi, JP 145 1509
Mori, Shinji Yokkaichi, JP 136 1001
Yamasaki, Hiroyuki Chiba, JP 70 770

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00