Power supply unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9692256
SERIAL NO

15160646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply unit for supplying power to a device has a rechargeable, main battery; a charging arrangement for charging the main battery; a non-rechargeable back-up battery; load terminals for connection to a load; and a control unit for controlling supply of power to the load primarily from the main battery and secondarily from the back-up battery. The device is, in particular, a single bay, stand alone parking meter. In the event that the main battery runs low, the control unit is configured to supply power to the load from both the main battery and the back-up battery or only from the back-up battery. The back-up battery is easily replaceable, and the power supply unit has a bay, with connectors for receiving the back-up battery. The main battery is charged from solar panels. A communication device is provided to communicate status messages wirelessly to a control system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IPS GROUP INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hunter, Stephen John Randpark Extension, ZA 34 1757
Joubert, Andre Malan Edenvale, ZA 8 423

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00