Correlating energy to mix cement slurry under different mixing conditions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9782914
APP PUB NO 20160271834A1
SERIAL NO

14412036

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One example of correlating energy to mix well cement slurry under laboratory conditions to field conditions can be implemented as a method to determine energy to mix cement slurry. Electrical power supplied to an electric mixer in mixing a specified well cement slurry is measured. An energy to mix the specified well cement slurry is determined from the measuring. The determined energy to mix the specified well cement slurry and specifications of field equipment for use in mixing the specified well cement slurry at a well site are compared. The field equipment is a different configuration than the electric mixer. Based on the comparing, it is determined whether the well cement slurry needs redesigning according to capabilities of the field equipment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goel, Vivek S Humble, US 9 48
Iverson, Benjamin John Sprint, US 12 118
Otieno, Pauline Akinyi Spring, US 21 375
Sodhi, Thomas Singh New Caney, US 18 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00