Organic zinc catalyst, and manufacturing method thereof and manufacturing method of polyalkylene carbonate resin using the same (as amended)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10047196
APP PUB NO 20160272760A1
SERIAL NO

15034696

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to an organic zinc catalyst suppressing agglomeration among catalyst particles during a manufacturing method to have more uniform and finer particle size, thereby showing a more improved activity in a polymerization process for manufacturing a polyalkylene carbonate resin, a manufacturing method thereof, and a manufacturing method of a polyalkylene carbonate resin using the same, wherein the organic zinc catalyst is a zinc dicarboxylate-based organic zinc catalyst used for a reaction in which a polyalkylene carbonate resin is manufactured from carbon dioxide and epoxide and includes a monocarboxylic acid-derived moiety having a C3-C15 aliphatic hydrocarbon group (provided that at least one oxygen or carbonyl group is included or not included in the aliphatic hydrocarbon group) that is bonded to an end of at least one side of the zinc dicarboxylate-based organic zinc catalyst.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Hyun Ju Daejeon, KR 30 132
Kim, Sung-Kyoung Daejeon, KR 20 49
Park, Seung Young Daejeon, KR 87 307

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00