Residual stress measuring method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10018522
SERIAL NO

15033805

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method capable of accurately measuring, in an object including a columnar shaft section and a tabular section projecting outward radially beyond an outer circumferential surface of the shaft section, a distribution of residual stress near a fillet surface interconnecting the shaft section and the tabular section. The method includes repeating a measurement cycle, which includes cutting the object to form a new cutting surface and measuring residual stress in a plurality of parts on the cutting surface. The cutting surface is a conical or cylindrical surface concentric with the axis of the shaft section, being through a reference position unchanged in the repeated measurement cycle. The reference position is desirably the center position of an arc of the fillet surface having the largest diameter on the central longitudinal cross-section of the object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyagawa, Masahiro Takasago, JP 1 4
Murakami, Kenji Takasago, JP 113 966
Okita, Keisuke Kobe, JP 46 526
Yamada, Mariko Takasago, JP 19 472

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00