Opto-electric hybrid board and production method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9618710
APP PUB NO 20160274317A1
SERIAL NO

15031943

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An opto-electric hybrid board according to the present invention includes a substrate including an insulation layer and a metal reinforcement layer. An electric circuit part is provided on the front surface of the substrate, and an optical waveguide part is provided on the back surface thereof. The metal reinforcement layer includes an optical coupling through hole and an alignment through hole. The electric circuit part includes an electrical interconnect line, an optical element, a first alignment mark for positioning of a mirror part, and a second alignment mark for positioning of the optical element. The mirror part of the optical waveguide part is positioned with respect to the first alignment mark visually recognized through the alignment through hole, and the optical element of the electric circuit part is positioned with respect to the second alignment mark.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NITTO DENKO CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shibata, Naoki Ibaraki, JP 188 3201
Tsujita, Yuichi Ibaraki, JP 55 150

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 11, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00