Semiconductor memory device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9524787
APP PUB NO 20160276034A1
SERIAL NO

15061960

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor memory device includes memory cells, word lines that are electrically connected to gates of the memory cells, a source line that is electrically connected to one end of the memory cells, and a controller that executes a read operation over first, second, third, and fourth time periods. A first voltage is applied to a selected word line during the first and second time periods of the first operation, and a second voltage that is higher than the first voltage is applied to the selected word line during the third and fourth time periods of the second operation. A third voltage is applied to the source line during the first and third time periods, and fourth and fifth voltages that are lower than the third voltage are applied to the source line during the second and fourth time periods, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maejima, Hiroshi Setagaya Tokyo, JP 234 4162

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00