Network management based on modeling of cascading effect of failure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10389600
APP PUB NO 20160283850A1
SERIAL NO

14665316

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method of managing a network with assets are described. The method includes generating a directed graph with each of the assets represented as a node, determining individual failure probability of each node, computing downstream failure probability of each node according to an arrangement of the nodes in the directed graph, computing upstream failure probability of each node according to the arrangement of the nodes in directed graph, and computing network failure probability for each node based on the corresponding individual failure probability, the downstream failure probability, and the upstream failure probability. Managing the network is based on the network failure probability of the assets.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UTOPUS INSIGHTS INC117 E STEVENS AVENUE SUITE 200 VALHALLA NY 10595

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aggarwal, Aanchal White Plains, US 11 29
Kim, Younghun White Plains, US 102 380
Kumar, Tarun Mohegan Lake, US 89 602
Lavin, Mark A Katonah, US 87 3032
Pagani, Giuliano Andrea Groningen, NL 4 11
Raman, Abhishek Mahopac, US 22 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00