Simplified process for vertical LED manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9502609
APP PUB NO 20160284928A1
SERIAL NO

14744602

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques for integrating spalling into layer transfer processes involving optical device semiconductor materials are provided. In one aspect, a layer transfer method for an optical device semiconductor material includes forming the optical device semiconductor material on a first substrate; depositing a metal stressor layer on top of the optical device semiconductor material; attaching a first handle layer to the metal stressor layer; removing the optical device semiconductor material from the first substrate by pulling the first handle layer away from the first substrate; attaching a second handle layer to the optical device semiconductor material; removing the first handle layer from the stack; and forming a second substrate on the stressor layer. Vertical LED devices and techniques for formation thereof are also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bedell, Stephen W Wappingers Falls, US 409 5528
Fogel, Keith E Hopewell Junction, US 270 4144
Lauro, Paul A Brewster, US 85 1914
Sadana, Devendra K Pleasantville, US 897 9915

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00