Drill bit having improved journal bearings

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10619419
APP PUB NO 20160290052A1
SERIAL NO

15038411

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A disclosed example embodiment includes a drill bit used to form wellbores in subterranean formations. The drill bit includes a drill bit body for coupling to a lower end of a drill string. The drill bit body includes at least one support arm having an inwardly extending journal with a journal bearing having at least one radially reduced pocket extending at least partially circumferentially around the journal bearing including a load side of the journal bearing. At least one rotary cutter assembly is rotatably mounted to the journal. A plurality of cutting elements is disposed on the at least one rotary cutter assembly. At least two independent hardmetal pads are positioned within the at least one radially reduced pocket such that the hardmetal pads have a gap disposed therebetween.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bird, Jay Stuart The Woodlands, US 9 96
Crawford, Micheal Burl Montgomery, US 7 7
Lee, Young Ho Conroe, US 105 756
Williams, Mark Evans Conroe, US 5 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00