Condenser for condensing steam from a steam turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10190826
APP PUB NO 20160290723A1
SERIAL NO

15037821

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A condenser includes: a vessel (11) configured to receive a steam flow (S) in a first horizontal direction (X); and cooling tube groups (21, 22, 23, 24) elongated in the first horizontal direction (X) inside the vessel. Each of the cooling tubes groups has a plurality of cooling tubes (31) that are disposed in parallel and extend in a second horizontal direction (Y), which intersects with the first horizontal direction. A hollow portion (32) is formed in the first horizontal direction (X) inside each of the cooling tube groups. A non-condensed gas discharge unit (33) is arranged in the second horizontal direction (Y) at a downstream side of each of the cooling tube groups and includes an opening portion (34) on the hollow portion side. Each of the cooling tube groups includes a partition member (35) extending from the non-condensed gas discharge unit and open at the hollow portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HITACHI POWER SYSTEMS, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Issaku Tokyo, JP 15 81
Nakamura, Taichi Tokyo, JP 88 222

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00