Magnetic shift register

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10026431
APP PUB NO 20160293197A1
SERIAL NO

15032951

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure relates to a memory device that includes at least one magnetic track on a substrate, wherein the at least one magnetic track comprises one or more magnetic domains. Contacts can be disposed on the at least one magnetic track according to a predetermined arrangement to form a plurality of bitcells on the at least one magnetic track, wherein each one of the plurality of bitcells is configured to store at least one magnetic domain. The device can include a timing circuit connected to the contacts, with the timing circuit being configured to apply to the contacts multiple phases of electric currents according to a predetermined timing sequence to cause the at least one magnetic domain to shift from the each one of the plurality of bitcells to an adjacent one of the plurality of bitcells on the at least one magnetic track.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CARNEGIE MELLON UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bromberg, David M Pittsburgh, US 5 34
Pileggi, Lawrence Pittsburgh, US 21 507
Zhu, Jian-Gang Pittsburgh, US 36 1178

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00