Warpage reduction in structures with electrical circuitry

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9853000
SERIAL NO

15181861

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To reduce warpage in at least one area of a wafer, a stress/warpage management layer (810) is formed to over-balance and change the direction of the existing warpage. For example, if the middle of the area was bulging up relative to the area's boundary, the middle of the area may become bulging downward, or vice versa. Then the stress/warpage management layer is processed to reduce the over-balancing. For example, the stress/management layer can be debonded from the wafer at selected locations, or recesses can be formed in the layer, or phase changes can be induced in the layer. In other embodiments, this layer is tantalum-aluminum that may or may not over-balance the warpage; this layer is believed to reduce warpage due to crystal-phase-dependent stresses which dynamically adjust to temperature changes so as to reduce the warpage (possibly keeping the wafer flat through thermal cycling). Other features are also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INVENSAS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Uzoh, Cyprian Emeka San Jose, US 329 9032

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00