Dynamic creation and management of ephemeral coordinated feedback instances

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10129156
APP PUB NO 20160294704A1
SERIAL NO

14675670

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Concepts and technologies disclosed herein are directed to the dynamic creation and management of ephemeral coordinated feedback instances. In accordance with one aspect disclosed herein, a system can receive a feedback instance creation request. The feedback instance creation request can be received from a policy engine in response to the policy engine attempting to satisfy a policy request. The system can examine the feedback instance creation request to determine an objective to be met by a new feedback instance model. The system can build a specification for the new feedback instance model. The specification can be built in accordance with a feedback instance building policy. The system can create the new feedback instance model in accordance with the specification. The system can store the new feedback instance model and a unique identifier associated with the new feedback instance model in a feedback instance model repository.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AT&T INTELLECTUAL PROPERTY I, L.P.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aaron, Jeffrey A Atlanta, US 161 5002
Fan, James W San Ramon, US 41 828

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 13, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 13, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00