Efficient uplink timing synchronization for fixed-location M2M terminals

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10136402
APP PUB NO 20160295532A1
SERIAL NO

14674982

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for determining synchronization of uplink timing in a machine type communication (MTC) system comprising a machine type communication device (MTCD) and a network element is disclosed that takes advantage of the MTCD being at a fixed location relative to the network element. The method includes receiving at the MTCD an uplink timing adjustment value from the network element and storing the uplink timing adjustment value at the MTCD. The MTCD then uses the stored uplink timing adjustment value from a previous uplink transmission for synchronizing uplink timing for a subsequent uplink transmission from the MTCD to the network element even following a period of inactivity of the MTCD, or expiration of any existing maximum uplink timing alignment period permitted for use of the timing adjustment value by the MTCD, or MTCD clock drift.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Yu Kanata, CA 387 9107
Jia, Ming Ottawa, CA 419 10176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 20, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 20, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00