Method to produce functionalized, low viscosity ethylene-based polymers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10131732
APP PUB NO 20160304650A1
SERIAL NO

15101343

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a process to form a “functionalized ethylene-based polymer” from an ethylene-based polymer and at least one polar compound, said process comprising thermally treating a composition comprising the ethylene-based polymer, the at least one polar compound, and at least one peroxide, in at least one extruder comprising at least one barrel, to form a polymer melt; and wherein the at least one peroxide has a half life, at the maximum barrel temperature of the at least one extruder, of less than of the minimum residence time of the polymer melt in the at least one extruder. The invention further provides a composition comprising at least the following: a) an ethylene-based polymer comprising a melt viscosity, at 350° F. (177° C.), less than 50.000 cP, and b) at least one peroxide comprising a half-life from 0.10 to 2.00 minutes, at a temperature from 160° C. to 190° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DOW GLOBAL TECHNOLOGIES LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bawiskar, Santosh S Freeport, US 23 22
Read, Michael D Midland, US 28 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 20, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 20, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00