Methods for co-processing carbon dioxide and hydrogen sulfide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9951430
SERIAL NO

14688578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for co-processing H2S and CO2 in an electrolyzer includes feeding a first gas stream having H2S to an anode and feeding a second gas stream having CO2 to a cathode. The H2S is split into hydrogen and elemental sulfur. The hydrogen is transferred from the anode to the cathode, and the CO2 is hydrogenated with the transferred hydrogen. A method for producing electricity in a fuel cell includes feeding a first gas stream having H2S and CO to an anode, and feeding a second gas stream having oxygen to a cathode. The H2S and CO forms hydrogen and carbonyl sulfide. The hydrogen is transferred from the anode to the cathode. The transferred hydrogen is oxidized with the oxygen of the second gas stream, and electricity formed from the oxidation is collected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYP O BOX 5000 DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ballesteros, Alberto Lozano Dhahran, SA 14 91
Simeon, Fritz Abqaiq, SA 5 34
Souentie, Stamatios Dhahran, SA 17 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00