Curable thermally conductive grease, heat dissipation structure, and method for producing heat dissipation structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10626311
SERIAL NO

15103426

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A curable thermally conductive grease 1a contains a curable liquid polymer, a thermally conductive filler (A) having an average particle diameter of less than 10 μm, and a thermally conductive filler (B) having an average particle diameter of 10 μm or more, the ratio by volume of the thermally conductive filler (A) to the thermally conductive filler (B), i.e., (A)/(B), being 0.65 to 3.02, and the curable thermally conductive grease having a viscosity of 700 Pa·s to 2070 Pa·s, in which after the curable thermally conductive grease is applied to the heat-generating body or the heat-dissipating body to a thickness of 5 mm, the curable thermally conductive grease has slump resistance in which the curable thermally conductive grease does not flow down when the heat-generating body or the heat-dissipating body is vertically arranged.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEKISUI POLYMATECH CO LTDSAITAMA-CITY SAITAMA 338-0837

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitada, Gaku Saitama, JP 9 4
Watanabe, Yasuyoshi Saitama, JP 57 390

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00