Pre-plated spline formed fastener and method for making same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10197082
APP PUB NO 20160312814A1
SERIAL NO

15087545

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for making a plated spline nail includes plating an elongated wire with a corrosion resistant material, passing the wire through a forming machine having rollers configured with protrusions formed thereon and extending outwardly therefrom to form grooves in the wire. cutting the wire to a desired length and forming a head, and a point on the wire to form the nail. The nail may have ring shanks formed therein after the head and point are formed. A lubricant may be applied to the nail and/or the forming machine prior to forming the ring shanks and/or prior to passing the wire through the forming machine to form the grooves in the wire. A nail formed by pre-plating the wire, and a nail formed by the method are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ILLINOIS TOOL WORKS INC155 HARLEM AVENUE GLENVIEW IL 60025

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergstrom, Donald E Lindenhurst, US 48 759
Gabriel, William L Barrington, US 29 459
Kram, Guenther R Bartlett, US 3 32
Prinds, Kenn C Egtved, DK 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00